<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.3 20210610//EN" "JATS-journalpublishing1-3.dtd">
<article article-type="research-article" dtd-version="1.3" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xml:lang="ru"><front><journal-meta><journal-id journal-id-type="publisher-id">veststu</journal-id><journal-title-group><journal-title xml:lang="ru">Вестник Сибирского государственного университета путей сообщения</journal-title><trans-title-group xml:lang="en"><trans-title>Bulletin of Siberian State University of Transport</trans-title></trans-title-group></journal-title-group><issn pub-type="ppub">1815-9265</issn><publisher><publisher-name>Сибирский государственный университет путей сообщения</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.52170/1815-9265_2023_64_102</article-id><article-id custom-type="elpub" pub-id-type="custom">veststu-59</article-id><article-categories><subj-group subj-group-type="heading"><subject>Research Article</subject></subj-group><subj-group subj-group-type="section-heading" xml:lang="ru"><subject>СТРОИТЕЛЬСТВО И АРХИТЕКТУРА</subject></subj-group><subj-group subj-group-type="section-heading" xml:lang="en"><subject>BUILDING AND ARCHITECTURE</subject></subj-group></article-categories><title-group><article-title>Анализ структуры технико-экономических затрат по видам восстановления целостности плети бесстыкового пути</article-title><trans-title-group xml:lang="en"><trans-title>Technical and economic costs structure analysis by types of the continuous welded rails length integrity restoration</trans-title></trans-title-group></title-group><contrib-group><contrib contrib-type="author" corresp="yes"><name-alternatives><name name-style="eastern" xml:lang="ru"><surname>Величко</surname><given-names>Д. В.</given-names></name><name name-style="western" xml:lang="en"><surname>Velichko</surname><given-names>D. V.</given-names></name></name-alternatives><bio xml:lang="ru"><p>Дмитрий Валерьевич Величко – доцент кафедры «Путь и путевое хозяйство», кандидат технических наук</p><p>Новосибирск</p></bio><bio xml:lang="en"><p>Dmitry V. Velichko – Associate Professor of the Railway Track and Track Facilities Department, Candidate of Engineering</p><p>Novosibirsk</p></bio><email xlink:type="simple">vdv.nsk@mail.ru</email><xref ref-type="aff" rid="aff-1"/></contrib><contrib contrib-type="author" corresp="yes"><name-alternatives><name name-style="eastern" xml:lang="ru"><surname>Карюкин</surname><given-names>М. А.</given-names></name><name name-style="western" xml:lang="en"><surname>Karyukin</surname><given-names>M. A.</given-names></name></name-alternatives><bio xml:lang="ru"><p>Максим Александрович Карюкин – аспирант кафедры «Путь и путевое хозяйство»</p><p>Новосибирск</p></bio><bio xml:lang="en"><p>Maxim A. Karyukin – Postgraduate Student of the Railway Track and Track Facilities Department</p><p>Novosibirsk</p></bio><email xlink:type="simple">m.caryuckin@yandex.ru</email><xref ref-type="aff" rid="aff-1"/></contrib></contrib-group><aff-alternatives id="aff-1"><aff xml:lang="ru"><institution>Сибирский государственный университет путей сообщения</institution><country>Россия</country></aff><aff xml:lang="en"><institution>Siberian Transport University</institution><country>Russian Federation</country></aff></aff-alternatives><pub-date pub-type="collection"><year>2023</year></pub-date><pub-date pub-type="epub"><day>30</day><month>03</month><year>2023</year></pub-date><volume>0</volume><issue>1</issue><fpage>102</fpage><lpage>108</lpage><permissions><copyright-statement>Copyright &amp;#x00A9; Величко Д.В., Карюкин М.А., 2023</copyright-statement><copyright-year>2023</copyright-year><copyright-holder xml:lang="ru">Величко Д.В., Карюкин М.А.</copyright-holder><copyright-holder xml:lang="en">Velichko D.V., Karyukin M.A.</copyright-holder><license xml:lang="ru" license-type="creative-commons-attribution" xlink:href="https://creativecommons.org/licenses/by/4.0/" xlink:type="simple"><license-p>Данная работа распространяется под лицензией Creative Commons Attribution 4.0.</license-p></license><license xml:lang="en" license-type="creative-commons-attribution" xlink:href="https://creativecommons.org/licenses/by/4.0/" xlink:type="simple"><license-p>This work is licensed under a Creative Commons Attribution 4.0 License.</license-p></license></permissions><self-uri xlink:href="https://www.vestnikstu.ru/jour/article/view/59">https://www.vestnikstu.ru/jour/article/view/59</self-uri><abstract><p>   Для обеспечения условий безопасного и бесперебойного движения поездов, а также прогнозирования более точных экономических потерь, связанных с ограничением скоростей движения или простоем поездов, остается актуальной задача разработки расчета для оперативного определения потребности в работах по техническому обслуживанию и ремонту пути. Расчет должен учитывать такие основные показатели, как количество пар обращающихся поездов в сутки, масса поездов брутто, тип и масса используемых локомотивов.   В статье рассматривается анализ расчета стоимости восстановления целостности плети, учитывающего экономические затраты, необходимые для ликвидации причин ограничения скорости подвижного состава, затраты на текущее содержание, стоимость необходимых для замены элементов верхнего строения пути и затраты в случае простоя или ограничения скорости движения.   Подробно представлена структура предложенного расчета. С учетом существующей технической документации и распоряжений, действующих на Западно-Сибирской железной дороге, рассмотрены примеры использования расчета в условиях Транссибирской магистрали, Среднесибирской магистрали и малодеятельных линий.   На основе проведенных расчетов определено, что динамика изменения итоговых затрат на восстановление рельсовой плети в большей степени зависит от расходов на краткосрочное восстановление.   В зависимости от количества пар поездов, обращающихся на участке восстановления рельсовой плети, меняется количество поездов (от одного до четырех пассажирских и от трех до десяти грузовых), попадающих под ограничение скорости движения. Увеличивается их общее время в пути, а следовательно, и расходы на потребляемую электроэнергию.</p></abstract><trans-abstract xml:lang="en"><p>   In order to ensure the conditions for safe and uninterrupted train traffic, as well as to predict more accurate economic losses associated with limiting the speed of movement or downtime of trains, the task of developing a calculation for promptly determining the need for maintenance and repairs of the track remains urgent. The calculation should take into account such basic data as: the number of train pairs in circulation per day, the gross mass of trains, the type and mass of locomotives used.   The article considers the cost calculation analysis of rail length integrity restoration, taking into account the economic costs necessary to eliminate the causes of the rolling stock speed limit, the costs of current maintenance, the cost of the permanent way elements necessary for replacement and the costs in cases of downtime or speed limit.   The structure of the proposed calculation is presented in detail. Using the example of existing technical documentation and taking into account the orders in force on the West Siberian Railway, examples of the use of calculation in the conditions of Trans-Siberian railway, the Central Siberian Railway and low-activity lines are considered.   Based on the calculations carried out, it was determined that the dynamics of changes in the final costs of restoring the rail length largely depends on the costs of short-term restoration.   Depending on the number of pairs of trains running along the section of the rail length restoration, the number of trains (from one to four passenger and from three to ten freight) falling under the speed limit changes.</p></trans-abstract><kwd-group xml:lang="ru"><kwd>бесстыковой путь</kwd><kwd>рельс</kwd><kwd>текущее содержание</kwd><kwd>восстановление целостности</kwd><kwd>рельсовая плеть</kwd><kwd>экономические затраты</kwd></kwd-group><kwd-group xml:lang="en"><kwd>continuous welded rails</kwd><kwd>rail</kwd><kwd>current maintenance</kwd><kwd>the integrity restoration</kwd><kwd>rail length</kwd><kwd>economic costs</kwd></kwd-group></article-meta></front><back><ref-list><title>References</title><ref id="cit1"><label>1</label><citation-alternatives><mixed-citation xml:lang="ru">Величко Д. В. Особенности эксплуатации бесстыкового пути при превышении нормативного тоннажа // Вестник Сибирского государственного университета путей сообщения. 2010. № 22. С. 49–53.</mixed-citation><mixed-citation xml:lang="en">Velichko D. V. Features of the operation of a jointless track when exceeding the standard tonnage. The Siberian Transport University Bulletin. 2010;(22):49–53. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit2"><label>2</label><citation-alternatives><mixed-citation xml:lang="ru">Анализ технического состояния бесстыкового пути на Западно-Сибирской железной дороге / Д. В. Величко, Д. Г. Шелеметьев, Е. С. Антерейкин, А. А. Николаенко // Вестник Сибирского государственного университета путей сообщения. 2017. № 3. С. 5–11.</mixed-citation><mixed-citation xml:lang="en">Velichko D. V., Sheremetyev D. G., Antereikin E. S., Nikolaenko A. A. Analysis of the technical condition of continuous welded rails on the West Siberian Railway. The Siberian Transport University Bulletin. 2017;(3):5–11. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit3"><label>3</label><citation-alternatives><mixed-citation xml:lang="ru">Щепотин Г. К. Влияние грузонапряженности и осевых нагрузок на долговечность рельсов в регионах с холодным климатом // Вестник Сибирского государственного университета путей сообщения. 2021. № 1 (56). С. 12–19.</mixed-citation><mixed-citation xml:lang="en">Shchepotin G. K. Influence of load-carrying capacity and axial loads on the durability of rails in regions with cold climates. The Siberian Transport University Bulletin. 2021;(56):12–19. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit4"><label>4</label><citation-alternatives><mixed-citation xml:lang="ru">Инструкция по оценке состояния рельсовой колеи путеизмерительными средствами и мерам по обеспечению безопасности движения поездов : утверждена распоряжением ОАО «РЖД» от 28.02.2020 № 436/р : с изменениями от 01.04.2021. Москва : ОАО «РЖД», 2021. 87 с.</mixed-citation><mixed-citation xml:lang="en">Instructions for assessing the condition of the track gauge by track measuring means and measures to ensure the train traffic safety: approved by order of Russian Railways No. 436/r dated February 28, 2020: as amended on April 1, 2021. Moscow: Russian Railways; 2021. 87 p. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit5"><label>5</label><citation-alternatives><mixed-citation xml:lang="ru">Инструкция по устройству, укладке, содержанию и ремонту бесстыкового пути : утверждена распоряжением ОАО «РЖД» от 14.12.2016 № 2544/р : редакция от 19.10.2020. Москва : ОАО «РЖД», 2020. 129 с.</mixed-citation><mixed-citation xml:lang="en">Instructions for the device, installation, maintenance and repair of continuous welded rails: approved by order of Russian Railways No. 2544 dated December 14, 2016: as amended on October 19, 2020. Moscow: Russian Railways; 2020. 129 p. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit6"><label>6</label><citation-alternatives><mixed-citation xml:lang="ru">Инструкция по текущему содержанию железнодорожного пути : утверждена распоряжением ОАО «РЖД» от 14.11.2016 № 2288/р. Москва : ОАО «РЖД», 2016. 289 с.</mixed-citation><mixed-citation xml:lang="en">Instructions for the current maintenance of the railway track: approved. by order of Russian Railways No. 2288r dated November 14, 2016. Moscow: Russian Railways; 2016. 289 p. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit7"><label>7</label><citation-alternatives><mixed-citation xml:lang="ru">Щепотин Г. К., Величко Д. В., Славиковская Э. А. Технико-экономическая оценка эффективности бесстыкового пути в условиях Сибири : методическое пособие. Новосибирск : Издательство Сибирского государственного университета путей сообщения, 2006. 50 с.</mixed-citation><mixed-citation xml:lang="en">Shchepotin G. K., Velichko D. V., Slavikovskaya E. A. Technical and economic assessment of the effectiveness of continuous welded rails in Siberia: Methodical manual. Novosibirsk: Siberian Transport University Publishing House; 2006. 50 p. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit8"><label>8</label><citation-alternatives><mixed-citation xml:lang="ru">Правила технической эксплуатации железных дорог Российской Федерации : утверждены приказом Минтранса России от 23.06.2022 № 250. Москва, 2022. 514 с.</mixed-citation><mixed-citation xml:lang="en">Rules of technical operation of railways of the Russian Federation: approved by order of the Ministry of Transport of the Russian Federation No. 250 dated June 6, 2022. Moscow; 2022. 514 p. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit9"><label>9</label><citation-alternatives><mixed-citation xml:lang="ru">Нормы времени на работы по текущему содержанию пути. Часть 2. Работы по рельсам и скреплениям : утверждены распоряжением ОАО «РЖД» от 11.01.2018 № 22/р. Москва : ОАО «РЖД», 2018. 393 с.</mixed-citation><mixed-citation xml:lang="en">Norms of time for work on the current content of the path. Part 2. Work on rails and fasteners: approved. by order of Russian Railways No. 22r dated January 11, 2018. Moscow: Russian Railways; 2018. 393 p. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit10"><label>10</label><citation-alternatives><mixed-citation xml:lang="ru">Правила и технологии выполнения основных работ при текущем содержании пути : утверждены распоряжением ОАО «РЖД» от 30.11.2018 № ЦДИ-1511. Москва : ОАО «РЖД», 2018. 128 с.</mixed-citation><mixed-citation xml:lang="en">Rules and technologies for performing work with the current content of the path: approved. by order of Russian Railways No. CDI-1511 dated November 30, 2018. Moscow: Russian Railways; 2018. 128 p. (In Russ.).</mixed-citation></citation-alternatives></ref></ref-list><fn-group><fn fn-type="conflict"><p>The authors declare that there are no conflicts of interest present.</p></fn></fn-group></back></article>
