<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.3 20210610//EN" "JATS-journalpublishing1-3.dtd">
<article article-type="research-article" dtd-version="1.3" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xml:lang="ru"><front><journal-meta><journal-id journal-id-type="publisher-id">veststu</journal-id><journal-title-group><journal-title xml:lang="ru">Вестник Сибирского государственного университета путей сообщения</journal-title><trans-title-group xml:lang="en"><trans-title>Bulletin of Siberian State University of Transport</trans-title></trans-title-group></journal-title-group><issn pub-type="ppub">1815-9265</issn><publisher><publisher-name>Сибирский государственный университет путей сообщения</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.52170/1815-9265_2022_61_86</article-id><article-id custom-type="elpub" pub-id-type="custom">veststu-67</article-id><article-categories><subj-group subj-group-type="heading"><subject>Research Article</subject></subj-group><subj-group subj-group-type="section-heading" xml:lang="ru"><subject>СТРОИТЕЛЬСТВО И АРХИТЕКТУРА</subject></subj-group><subj-group subj-group-type="section-heading" xml:lang="en"><subject>BUILDING AND ARCHITECTURE</subject></subj-group></article-categories><title-group><article-title>Структурно-модульная параметризация дорожно-строительного потока в системе информационного моделирования</article-title><trans-title-group xml:lang="en"><trans-title>Structural modular parameterization of the road construction flow in the information modeling system</trans-title></trans-title-group></title-group><contrib-group><contrib contrib-type="author" corresp="yes"><name-alternatives><name name-style="eastern" xml:lang="ru"><surname>Боброва</surname><given-names>Т. В.</given-names></name><name name-style="western" xml:lang="en"><surname>Bobrova</surname><given-names>T. V.</given-names></name></name-alternatives><bio xml:lang="ru"><p>Татьяна Викторовна Боброва</p><p>Омск</p></bio><bio xml:lang="en"><p>Professor of the Economics and Project Management in Transport Construction Department, Doctor of Engineering</p><p>Omsk</p></bio><email xlink:type="simple">bobrova.tv@gmail.com</email><xref ref-type="aff" rid="aff-1"/></contrib></contrib-group><aff-alternatives id="aff-1"><aff xml:lang="ru"><institution>Сибирский государственный автомобильно-дорожный университет</institution><country>Россия</country></aff><aff xml:lang="en"><institution>Siberian State Automobile and Highway University</institution><country>Russian Federation</country></aff></aff-alternatives><pub-date pub-type="collection"><year>2022</year></pub-date><pub-date pub-type="epub"><day>30</day><month>06</month><year>2022</year></pub-date><volume>0</volume><issue>2</issue><elocation-id>86–95</elocation-id><permissions><copyright-statement>Copyright &amp;#x00A9; Боброва Т.В., 2022</copyright-statement><copyright-year>2022</copyright-year><copyright-holder xml:lang="ru">Боброва Т.В.</copyright-holder><copyright-holder xml:lang="en">Bobrova T.V.</copyright-holder><license xml:lang="ru" license-type="creative-commons-attribution" xlink:href="https://creativecommons.org/licenses/by/4.0/" xlink:type="simple"><license-p>Данная работа распространяется под лицензией Creative Commons Attribution 4.0.</license-p></license><license xml:lang="en" license-type="creative-commons-attribution" xlink:href="https://creativecommons.org/licenses/by/4.0/" xlink:type="simple"><license-p>This work is licensed under a Creative Commons Attribution 4.0 License.</license-p></license></permissions><self-uri xlink:href="https://www.vestnikstu.ru/jour/article/view/67">https://www.vestnikstu.ru/jour/article/view/67</self-uri><abstract><p>Анализ реализации сложных строительных проектов в России и за рубежом с использованием BIM-технологий выявил важность оптимизации проектных решений на стадии календарного планирования. Неадекватное отражение в процессе моделирования реальных условий линейного дорожного строительства приводит к нарушению сроков ввода объектов в эксплуатацию, снижению эффективности организационно-технологических решений. Цель данного исследования: обеспечить адекватность модели и оптимизацию сроков строительства автомобильных дорог непосредственно в процессе информационного моделирования комплексного потока. Для решения проблемы использована теория структурно-параметрического синтеза потоковых систем. Комплексный дорожно-строительный поток рассмотрен на двух уровнях: микроуровень – параметры отдельных звеньев специализированных потоков; макроуровень – параметры взаимодействия специализированных потоков в качестве самостоятельных объектов моделирования между собой. Структурная декомпозиция объекта представлена в виде графа с вертикальным разделением на третьем уровне на относительно однородные участки с выделением двух видов модулей – линейных и сосредоточенных проектно-технологических модулей (ЛПТМ и СПТМ). Реализована концепция, основанная на конвергенции ранее созданных имитационных моделей оптимизации комплексного дорожно-строительного потока и информационного моделирования, с переходом модельного времени с постоянным шагом ∆t к модельно-событийному. Представлена математическая постановка задачи, определены ограничения и целевая функция. В качестве демонстрационного примера представлен расчет оптимального календарного графика строительства дороги при заданных ресурсах в программе MS Project. Инструментарий программы позволил учесть изменение режима работы предприятия в течение года, особенности перехода к зимним технологиям. График Ганта, рассчитанный с использованием данного метода, трансформирован в линейный график в осях «продолжительность – протяженность».</p></abstract><trans-abstract xml:lang="en"><p>The analysis of the implementation of complex construction projects in Russia and abroad using BIM technologies revealed the importance of optimizing design solutions at the scheduling stage. Inadequate reflection in the process of modeling the real conditions of linear road construction leads to a violation of the terms of facilities’ commissioning and reduces in the efficiency of organizational and technological solutions. The purpose of this research is to provide the adequacy of the model and optimization of the highway construction timing, directly in the process of information modeling of a complex flow. To solve the problem, the theory of structural-parametric synthesis of flow systems has been used. The complex road construction flow is considered on two levels: micro level for parameters of separate links of specialized flows; macro level for parameters of interaction of specialized flows as independent objects of modeling between them. The structural decomposition of the object is presented in the form of a graph with vertical division at the 3rd level into relatively homogeneous areas with the allocation of two types of modules: linear design and technological modules (LDTM); concentrated design and technological modules (CDTM). The concept is implemented based on the convergence of previously created simulation models for the optimization of complex road construction flow and information modeling, with the transition of model time from "∆t" to model-event. The mathematical statement of the problem is presented, the constraints and the objective function are determined. As a demonstration example, the calculation of the optimal calendar schedule for the construction of a road for given resources in the MS Project program is presented. The toolkit of the program made it possible to take into account the change in the operating mode of the enterprise during the year, the peculiarities of the transition to winter technologies. The Gantt chart, calculated using this method, has been transformed into a linear graph in the axis “duration – length”.</p></trans-abstract><kwd-group xml:lang="ru"><kwd>дорожное строительство</kwd><kwd>информационное моделирование</kwd><kwd>структурная декомпозиция объекта</kwd><kwd>параметрический синтез</kwd><kwd>потоковая система</kwd><kwd>MS Project</kwd></kwd-group><kwd-group xml:lang="en"><kwd>road construction</kwd><kwd>information modelling</kwd><kwd>structural decomposition of the object</kwd><kwd>parametric synthesis</kwd><kwd>flow system</kwd><kwd>MS Project</kwd></kwd-group></article-meta></front><back><ref-list><title>References</title><ref id="cit1"><label>1</label><citation-alternatives><mixed-citation xml:lang="ru">Khodabandelu A., Park J. W. Agent-based modeling and simulation in construction // Automation in Con struction. 2021. Vol. 131. P. 103882. DOI 10.1016/j.autcon.2021.103882.</mixed-citation><mixed-citation xml:lang="en">Khodabandelu A., Park J. W. Agent-based modeling and simulation in construction. Automation in Construction. 2021;131:103882. DOI 10.1016/j.autcon.2021.103882.</mixed-citation></citation-alternatives></ref><ref id="cit2"><label>2</label><citation-alternatives><mixed-citation xml:lang="ru">Doukari O., Greenwood D. Automatic generation of building information models from digitized plans // Automation in Construction. 2020. Vol. 113. P. 103129. DOI 10.1016/j.autcon.2020.103129.</mixed-citation><mixed-citation xml:lang="en">Doukari O., Greenwood D. Automatic generation of building information models from digitized plans. Automation in Construction. 2020;113:103129. DOI 10.1016/j.autcon.2020.103129.</mixed-citation></citation-alternatives></ref><ref id="cit3"><label>3</label><citation-alternatives><mixed-citation xml:lang="ru">Возгомент Н. В. Современные вызовы и перспективы развития BIM-моделирования в России в эпоху цифровизации // E-Management. 2020. Т. 3, № 3. С. 20–27. DOI 10.26425/2658-3445-2020-3-3-20-27.</mixed-citation><mixed-citation xml:lang="en">Vozgoment N. V. Modern challenges and prospects for the development of BIM modeling in Russia in the epoch of digitalization. E-Management. 2020;3(3):20–27. DOI 10.26425/2658-3445-2020-3-3-20-27. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit4"><label>4</label><citation-alternatives><mixed-citation xml:lang="ru">Kabanov V. N. Organizational and technological reliability of the construction process // Magazine of Civil Engineering. 2018. No. 1 (77). P. 59–67. DOI 10.18720/MCE.77.6.</mixed-citation><mixed-citation xml:lang="en">Kabanov V. N. Organizational and technological reliability of the construction process. Magazine of Civil Engineering. 2018;(77):59–67. DOI 10.18720/MCE.77.6.</mixed-citation></citation-alternatives></ref><ref id="cit5"><label>5</label><citation-alternatives><mixed-citation xml:lang="ru">Kalugin Yu. B., Romanov R. S. Scheduling workflows for scattered objects // Magazine of Civil Engineer ing. 2018. No. 8 (84). P. 29–40. DOI 10.18720/MCE.84.3.</mixed-citation><mixed-citation xml:lang="en">Kalugin Yu. B., Romanov R. S. Scheduling workflows for scattered objects. Magazine of Civil Engineering. 2018;(84):29–40. DOI 10.18720/MCE.84.3.</mixed-citation></citation-alternatives></ref><ref id="cit6"><label>6</label><citation-alternatives><mixed-citation xml:lang="ru">Earned Schedule min-max: Two new EVM metrics for monitoring and controlling projects / P. Ballesteros Pérez, E. Sanz-Ablanedo, D. Mora-Melià [et al.] // Automation in Construction. 2019. Vol. 103. P. 279–290. DOI 10.1016/j.autcon.2019.03.016.</mixed-citation><mixed-citation xml:lang="en">Ballesteros-Pérez P., Sanz-Ablanedo E., Mora-Melià D. [et al.]. Earned Schedule min-max: Two new EVM metrics for monitoring and controlling projects. Automation in Construction. 2019;103:279–290. DOI 10.1016/j.autcon.2019.03.016.</mixed-citation></citation-alternatives></ref><ref id="cit7"><label>7</label><citation-alternatives><mixed-citation xml:lang="ru">Боброва Т. В., Дубенков А. А., Тытарь И. В. Совершенствование организационно-технологического проектирования линейных транспортных объектов на основе моделирования их пространственной декомпозиции // Системы. Методы. Технологии. 2016. № 4 (32). С. 169–175. DOI 10.18324/2077-5415-2016-4-169-175.</mixed-citation><mixed-citation xml:lang="en">Bobrova T. V., Dubenkov A. A., Tytar I. V. Improving the organizational and technological design of linear transport facilities based on modeling their spatial decomposition. Systems. Methods. Technology. 2016;(32):169–175. DOI 10.18324/2077-5415-2016-4-169-175. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit8"><label>8</label><citation-alternatives><mixed-citation xml:lang="ru">Bobrova T., Vorobyev V. Linear structure taxonomy with the account of environmental polystructures im pact // MATEC Web of Conferences. 2018. Vol. 216. https://doi.org/10.1051/matecconf/201821601003</mixed-citation><mixed-citation xml:lang="en">Bobrova T., Vorobyev V. Linear structure taxonomy with the account of environmental poly-structures impact. MATEC Web of Conferences. 2018;216. URL: https://doi.org/10.1051/matecconf/201821601003.</mixed-citation></citation-alternatives></ref><ref id="cit9"><label>9</label><citation-alternatives><mixed-citation xml:lang="ru">Абдуллаев Г. И., Величкин В. З., Солдатенко Т. Н. Повышение организационно-технологической надежности строительства линейно-протяженных сооружений методом прогнозирования отказов // Инженерно-строительный журнал. 2013. № 3 (38). С. 43–50. DOI 10.5862/MCE.38.6.</mixed-citation><mixed-citation xml:lang="en">Abdullaev G. I., Velichkin V. Z., Soldatenko T. N. Improving the organizational and technological reliability of the construction of linear-length structures by the method of failure prediction. Magazine of Civil Engineering. 2013(38):43–50. DOI 10.5862/MCE.38.6. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit10"><label>10</label><citation-alternatives><mixed-citation xml:lang="ru">Максимычев О. И., Бойков В. Н. Поддержка жизненного цикла проектов дорожно-строительных работ в парадигме цифровой экономики // САПР и ГИС автомобильных дорог. 2019. № 1 (12). С. 10–15. DOI 10.17273/CADGIS.2019.1.2.</mixed-citation><mixed-citation xml:lang="en">Maksimychev O. I., Boikov V. N. Support for the life cycle of road construction projects in the digital economy paradigm. CAD and GIS of automobile roads. 2019;(12):10–15. DOI 10.17273/CADGIS.2019.1.2. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit11"><label>11</label><citation-alternatives><mixed-citation xml:lang="ru">Боброва Т. В. Проектно-ориентированное управление производством работ на региональной сети автомобильных дорог : монография. Омск : Изд-во Сибирского государственного автомобильно-дорожного университета, 2006. 334 с.</mixed-citation><mixed-citation xml:lang="en">Bobrova T. V. Project-oriented management of the production of works on the regional network of highways: monograph. Omsk: Publishing House of the Siberian State Automobile and Highway University; 2006. 334 p. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit12"><label>12</label><citation-alternatives><mixed-citation xml:lang="ru">Строительство путей сообщения на Севере : научно-практическое издание / С. Я. Луцкий, Т. В. Шепитько, П. М. Токарев [и др.]. М. : ЛАТМЭС, 2009. 286 с.</mixed-citation><mixed-citation xml:lang="en">Lutsky S. Ya., Shepitko T. V.,  Tokarev P. M.  [et al.]. Construction of communication lines in the North: scientific and practical publication. M.: LATMES; 2009. 286 p. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit13"><label>13</label><citation-alternatives><mixed-citation xml:lang="ru">Брызгалова Р. М., Воробьев В. С., Каталымова К. В. Имитационная модель управления стоимостью железнодорожного строительства // Научные проблемы транспорта Сибири и Дальнего Востока. 2008. № 2. С. 51–57.</mixed-citation><mixed-citation xml:lang="en">Bryzgalova R. M., Vorobyov V. S., Katalymova K. V. Simulation model of railway construction cost control. Scientific problems of transport of Siberia and the Far East. 2008;(2):51–57. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit14"><label>14</label><citation-alternatives><mixed-citation xml:lang="ru">Имитационное моделирование в структуре создания БИМ-технологий строительных проектов / В. С. Воробьев, А. С. Синицына, К. В. Каталымова, Н. П. Запащикова // Известия высших учебных заведений. Строительство. 2018. № 5 (713). С. 105–115.</mixed-citation><mixed-citation xml:lang="en">Vorobyev V. S., Sinitsyna A. S., Katalymova K. V., Zapashchikova N. P. Simulation modeling in the structure of creating BIM technologies for construction projects. University Proceedings. Construction. 2018;(713):105–115. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit15"><label>15</label><citation-alternatives><mixed-citation xml:lang="ru">Воробьев В. С., Манаков А. Л. Концепция имитационного моделирования организации производства инфраструктурного комплекса железных дорог // Научные проблемы транспорта Сибири и Дальнего Востока. 2013. № 1. С. 81–85.</mixed-citation><mixed-citation xml:lang="en">Vorobyev V. S., Manakov A. L. The concept of simulation modeling of the infrastructure railway complex production organization. Scientific problems of transport in Siberia and the Far East. 2013;(1):81–85. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit16"><label>16</label><citation-alternatives><mixed-citation xml:lang="ru">Волков В. А., Чудинов С. М. Системный анализ для структурно-параметрического синтеза // Научные ведомости Белгородского государственного университета. Серия «Экономика. Информатика». 2012. № 19 (138). Вып. 24/1. С. 153–157.</mixed-citation><mixed-citation xml:lang="en">Volkov V. A., Chudinov S. M. System analysis for structural-parametric synthesis. Scientific Bulletin of the Belgorod State University. Series “Economics. Informatics”. 2012;138(24/1):153–157. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit17"><label>17</label><citation-alternatives><mixed-citation xml:lang="ru">Акимов С. В. Анализ проблемы автоматизации структурно-параметрического синтеза // Доклады Томского государственного университета систем управления и радиоэлектроники. 2011. № 2 (24), часть 2. С. 204–211.</mixed-citation><mixed-citation xml:lang="en">Akimov S. V. Analysis of the problem of automation of structural-parametric synthesis. Reports of the Tomsk State University of Control Systems and Radio Electronics. 2011;24(2):204–211. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit18"><label>18</label><citation-alternatives><mixed-citation xml:lang="ru">Аристов А. О. Теория квазиклеточных сетей : научная монография. М. : Изд-во Национального исследовательского технологического университета «МИСИС», 2014. 188 с. URL: https://vk.com/wall1563794_1577 (дата обращения: 15.01.2022).</mixed-citation><mixed-citation xml:lang="en">Aristov A. O. Theory of quasicellular networks: scientific monograph. M.: Publishing House of the National Research Technological University MISIS; 2014. 188 р. URL: https://vk.com/wall1563794_1577. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit19"><label>19</label><citation-alternatives><mixed-citation xml:lang="ru">Аристов А. О. Модели организации движения транспортных потоков на основе дискретных структур // Горный информационно-аналитический бюллетень. 2011. Т. 6. № 12. С. 662–675.</mixed-citation><mixed-citation xml:lang="en">Aristov A. O. Traffic flow organization models based on discrete structures. Mining Information and Analytical Bulletin. 2011;6(12):662–675. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit20"><label>20</label><citation-alternatives><mixed-citation xml:lang="ru">Informetric analysis and review of literature on the role of BIM in sustainable construction / R. Santos, A. A. Costa, J. D. Silvestre, L. Pyl // Automation in Construction. 2019. Vol. 103. P. 221–234. DOI 10.1016/j.autcon.2019.02.022.</mixed-citation><mixed-citation xml:lang="en">Santos R., Costa A. A., Silvestre J. D. and Pyl L. Informetric analysis and re-view of literature on the role of BIM in sustainable construction. Automation in Construction. 2019;103:221–234. DOI 10.1016/j.autcon.2019.02.022.</mixed-citation></citation-alternatives></ref><ref id="cit21"><label>21</label><citation-alternatives><mixed-citation xml:lang="ru">BIM-integrated construction safety risk assessment at the design stage of building projects / Y. Lu, P. Gong, Y. Tang [et al.] // Automation in Construction. 2021. Vol. 124. P. 103553. DOI 10.1016/j.autcon.2021.103553.</mixed-citation><mixed-citation xml:lang="en">Lu Y., Gong P., Tang Y. [et al.]. BIM-integrated construction safety risk assessment at the design stage of building projects. Automation in Construction. 2021;124:103553. DOI 10.1016/j.autcon.2021.103553.</mixed-citation></citation-alternatives></ref></ref-list><fn-group><fn fn-type="conflict"><p>The authors declare that there are no conflicts of interest present.</p></fn></fn-group></back></article>
